Skip to content

A CLEARER VIEW OF YOUR INFRASTRUCTURE

Infrastructure.
In perspective.

Know your assets. Understand their condition.
Plan what comes next—with confidence.

Meet ASTRA. Asset tracking and analytics that connects your data to better infrastructure decisions.

Explore the platform
Pavement management, available today.
ASTRA/Metro Pavement Network
Network connected
NORTH BLVD (PCI 86)OAK PKWY (PCI 68)ELM AVE (PCI 44)
SEC-104-B

Elm Avenue

44Poor
ClassificationMajor Collector
Dominant DistressHigh Alligator Cracking (14.2% density)
Recommended Work2" Cold Mill & Overlay
Estimated Investment$78,400
284 Centerline Miles•Network Avg PCI: 67.4•PAVER Compatibility: Full
BUILT FOR THE PEOPLE
BEHIND OUR INFRASTRUCTURE

Public works

Transportation agencies

Engineering consultants

01 / THE PLATFORM

See the whole picture.
Move forward with clarity.

From scattered records to a shared understanding. Bring the information you need into the decisions that matter.

01

ASSET INVENTORY

Know what you own.

Bring your inventory, GIS data, and asset history into one connected workspace.

02

CONDITION INTELLIGENCE

See what needs attention.

Connect inspections, condition scores, and deterioration models to see the whole picture.

03

INVESTMENT PLANNING

Make every investment count.

Compare budgets and treatment strategies. Build a work program you can explain.

Map-based explorationReports & analyticsRole-based project access

A CLEARER WAY FORWARD

ASTRA

A connected foundation for the infrastructure decisions ahead.

ENGINEERED FOR RIGOR

Built for engineering review.
Clear from inspection to recommendation.

Built to withstand review from state DOTs, federal agencies, and city councils.

Full PAVER compatibility

Continue working with established PAVER inspection data and PCI practices in a modern planning workspace.

PAVER & ASTM PCI workflows

Your agency data stays separate

Each agency works in its own secure project environment, with access controlled for staff and partners.

Controlled project access

Bring your existing data

Import roadway maps, section inventories, inspections, and maintenance records into your pavement program.

Common pavement & mapping formats

Practical multi-year planning

Compare funding choices and treatment strategies while honoring annual budgets and agency priorities.

Budget, condition & backlog scenarios

02 / INVESTMENT PLANNING

See how funding changes
network condition.

Compare five annual funding levels and see their illustrative effects on pavement condition, deferred maintenance, and corridor health.

INTERACTIVE 5-YEAR CIP SIMULATOR

What does 5 years do to your roads?

Drag the slider to compare annual budgets and see the projected effect on pavement condition, maintenance backlog, and corridor health.

Illustrative scenarios for a sample network; actual results depend on your inventory, treatment assumptions, and funding.

Interactive Multi-Year Planning
Annual Capital Budget$2.5M / yr

$2.5M / yr per year projects a network PCI of 68 after five years and a deferred maintenance backlog of $9.4M.

5-Year Network PCI +0.6 pts
68
Projected StatusSteady-State (Maintain PCI)
Deferred Maintenance Backlog
$9.4M

Protected against emergency reconstruction spikes

Network Health DistributionGood / Fair / Poor
64% Good 25% Fair 11% Poor
Simulated Network CorridorsBalanced preservation cycles (slurry seals) mixed with targeted mill & overlays.
SEC-100
SEC-107
SEC-114
SEC-121
SEC-128
SEC-135
SEC-142
SEC-149
SEC-156
SEC-163
SEC-170
SEC-177
💡

A balanced funding level supports preventive work while addressing the most urgent needs.

03 / PAVEMENT MANAGEMENT

Better roads begin
with better insight.

AVAILABLE TODAY

Our first complete solution brings your pavement network into focus—from individual inspections to long-term investment plans.

NORTH AVENUEPARK DRIVEGREENSPACENORTH PARK
ASTRA / InventoryConcept preview
Network inventoryOne connected view
NetworkSectionsHistory

Every asset. In context.

Explore your network through connected maps, inventory tables, and section histories.

  • GIS-linked asset records
  • Configurable inventory fields
  • Connected inspection history
See ASTRA in action

04 / CONDITION OVER TIME

See condition change
before the treatment decision.

Watch each asset move from a healthy starting condition to the point where it needs attention.

Pavement showing healthy and deteriorated condition
01PavementPCI 92 → 58
YEAR 0 → 8
Healthy surface→Treatment trigger

Traffic and water turn small surface cracks into a treatment decision.

Road striping showing healthy and deteriorated condition
02Road striping0.85 → 0.42
YEAR 2 → 6
Fresh marking→Low contrast

Wear and UV exposure reduce contrast and nighttime guidance.

STOP sign showing healthy and deteriorated condition
03STOP signRA 650 → 180
YEAR 4 → 10
High return→Below threshold

Retroreflectivity falls below the visibility threshold over time.

Static condition references · healthy state shown alongside deterioration

05 / FROM DATA TO DIRECTION

A connected process.
A confident next step.

A clear path from the information you have to the work your community needs.

01

Connect

Bring inventory, GIS, inspections, and history together.

02

Understand

Explore condition and see where attention is needed.

03

Plan

Compare budgets, treatments, and investment priorities.

04

Communicate

Make the case with clear maps, charts, and reports.

AVAILABLE TODAY / ASTRA

Start with pavement. Think beyond the road.

ASTRA brings pavement inventory, condition, inspection history, and multi-year planning into one connected workflow.

  • Road inventory and map exploration
  • Condition and inspection history
  • Maintenance and capital planning
Pavement management is available in ASTRA today.Explore pavement management

LET’S SEE WHAT’S POSSIBLE

Your assets.
A clearer way forward.

Explore what ASTRA can do for your pavement program.